Chiller replacement at Sterling Centre
Brief: To replace the previously oversized and unreliable chillers associated with the installation of a new building management system, and maximising control of the existing internal air-handling equipment and pumps.
Result: The client will save in the region of £80K of power consumption per annum, representing a payback period of 3 years or less.