Monthly Archives: August 2015

Open plan vs enclosed office space

A recent discussion reminded us of a report in The Telegraph a few years back which claimed that workers are less satisfied in open plan offices. The report sounded pretty conclusive, but in our experience there's much more to the matter than the attention-grabbing headlines let on!

17 August 2015|Categories: News articles|

Canteen refurbishment for Apetito

Apetito gave Procol the task updating an existing space with a full refurbishment, in order to provide a welcoming and adaptable restaurant area to be used for rest breaks and informal meetings.

6 August 2015|Categories: Recent projects|

IT hosting environment for a global data comms supplier

A global data comms supplier set us the task of converting an existing North London office into an IT hosting environment.

6 August 2015|Categories: Recent projects|

Refurbishment of Kingsbury House

The complete refurbishment of a two-storey former British Legion building into serviced offices.

6 August 2015|Categories: Recent projects|

Dry cooler replacement at a critical north London data centre

We were tasked with replacing the dry coolers at a critical data centre in North London, while ensuring there was no loss of service.

6 August 2015|Categories: Recent projects|

Office refurbishment for Micron

Micron were relocating and expanding, and asked us to refurbish their new offices.

6 August 2015|Categories: Recent projects|

Office refurbishment for the Medical Research Council

The Medical Research Council gave us the challenge of refurbishing two floors of office space in a distinctive curved high-rise office building.

6 August 2015|Categories: Recent projects|

Creating a training facility for Invensys Rail

Invensys Rail asked us to create a modern, flexible, self contained facility to accommodate formal and informal training.

6 August 2015|Categories: Recent projects|

Chiller replacement at Sterling Centre

Replacement of the previously oversized and unreliable chillers associated with the installation of a new building management system, and maximising control of the existing internal air-handling equipment and pumps.

6 August 2015|Categories: Recent projects|

Replacement of a heat exchanger at Bude Cable Landing Station

Recovery of a corroded and inefficient plate heat exchanger/dry cooler installation and replacement with a new Airedale free-cooling chiller.

6 August 2015|Categories: Recent projects|